Customization: | Available |
---|---|
Certification: | CE |
Coating Application: | Aerospace Industry, Automotive Industry, Construction Industry, Electronics Industry, Food Industry, Medical Industry, Renewable Energy Industry, Textile Industry |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model
|
GN-N-301
|
|
|
|
|||
Control system
|
10-inch PLC control touch screen
|
|
|
|
|||
Coating width
|
1600mm
|
|
|
|
|||
Unwinding Width
|
1650mm
|
|
|
|
|||
Coating Thickness
|
Quantitative roller
|
|
|
|
|||
Coating Method
|
Transfer (ceramic roller)
|
|
|
|
|||
Glue Supply Method
|
Fully automatic glue supply
|
|
|
|
|||
Material Mixing
|
Automatic mixing
|
|
|
|
|||
Corona Treatment
|
Pre-coating corona device (5KW)
|
|
|
|
|||
Drying Tunnel Length
|
30 meters (2 meters per section)
|
|
|
|
|||
Hot Air Circulation
|
Hot air discharge collection and recovery system
|
|
|
|
|||
Water Tank Length
|
30 meters (2 meters per section, with a valve installed at the bottom of the water tank)
|
|
|
|
|||
Drying Temperature
|
Room temperature - 130 degrees (settable constant temperature)
|
|
|
|
|||
Washing Device
|
High-pressure double-row spray gun
|
|
|
|
|||
Glue Scraping Device
|
Equipped with silicone scraper
|
|
|
|
|||
Post-Wash
|
Independent water supply for double-sided washing, air knife for double-sided drying
|
|
|
|
|||
Material Alignment
|
Front alignment - rear alignment
|
|
|
|
|||
Drying Tunnel Airflow
|
Adjustable
|
|
|
|
|||
Drying Tunnel Exhaust
|
Automatic waste gas discharge
|
|
|
|
|||
Drying Tunnel Lifting
|
Automatic pneumatic lifting
|
|
|
|
|||
Waste Heat Recovery
|
Automatic waste heat recovery (energy-saving ±30%)
|
|
|
|
|||
PET Tension
|
Pneumatic tension
|
|
|
|
|||
Casting Substrate
|
PET circular circulation
|
|
|
|
|||
Overall Leveling
|
The entire machine can be leveled
|
|
|
|
|||
Water Tank Drive
|
Maintenance-free drive mechanism
|
|
|
|
|||
Equipment Material
|
304 stainless steel for drying tunnel inner liner and water tank
|
|
|
|
|||
Equipment Speed
|
5-60 meters/minute (variable frequency speed regulation)
|
|
|
|
|||
Equipment Power Supply
|
380V 50Hz
|
|
|
|
|||
Equipment Power
|
200KW (peak value)
|
|
|
|
Q: Are your a trading company or factory? A: Factory+trade (integration), more than 20 years focusing on Lab coating machine field, 5 years exporting experience. |
|
|
|
|
||||
Q: After an order is placed, when to deliver? A: Generally about 15-25 working days, if there is ready stock for items, we can arrange shipment within 2 working days.Please be aware that our production lead times depend on specific items and item quantities. |
|
|
|
|
||||
Q: What about the warranty with after-sales services? A: 12 months warranty. We can help you repair your problem parts for free, after the warranty, our professional after-sale service team will provide perfect technical support and help our customers solve problems we encountered while use our products, handle customer problems and complaints in a professional and timely. |
|
|
|
|
||||
Q: What about the product's services and quality? A: Each piece of equipment must be carried out 100% quality examination and test when shipping and delivering goods. Product use training, each of our products provides video training to show you how to install & operate. We can arrange engineer to train the operation of equipment to customer's company when you need. products are widely recognized and trusted by users. |
|
|
|
|
||||
Q: Can your products be customized? A: Yes, our product can be customized according to your parameters. |
|
|
|
|