Customization: | Available |
---|---|
Certification: | CE |
Coating Application: | Aerospace Industry, Automotive Industry, Construction Industry, Food Industry, Medical Industry, Renewable Energy Industry, Textile Industry |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The uniformity of the coating scraping mainly depends on the full runout, cylindricity, and straightness of the blade of the comma scraper. The comma scraper coater is a relatively easy-to-use coating method because of its simple operation and wide range of glue viscosity. The small experimental coating table enables testers to easily apply precise coatings, reducing or eliminating errors caused by human factors such as different coating speeds and applied pressures during the coating process.
Model | GN-J-GD1600 |
Control System | 10-Inch PLC Control Touch Screen |
Coating Width | 1600mm |
Unwinding Width | 1650mm |
Coating Thickness | Quantitative Roller |
Coating Method | Transfer (Ceramic Roller) |
Glue Supply Method | Fully Automatic Glue Supply |
Material Mixing | Automatic Mixing |
Corona Treatment | Pre-Coating Corona Device (5KW) |
Drying Tunnel Length | 30 Meters (2 Meters Per Section) |
Hot Air Circulation | Hot Air Discharge Collection And Recovery System |
Water Tank Length | 30 Meters (2 Meters Per Section, With A Valve Installed At The Bottom Of The Water Tank) |
Drying Temperature | Room Temperature - 130 Degrees (Settable Constant Temperature) |
Washing Device | High-Pressure Double-Row Spray Gun |
Glue Scraping Device | Equipped With Silicone Scraper |
Post-Wash | Independent Water Supply For Double-Sided Washing, Air Knife For Double-Sided Drying |
Material Alignment | Front Alignment - Rear Alignment |
Drying Tunnel Airflow | Adjustable |
Drying Tunnel Exhaust | Automatic Waste Gas Discharge |
Drying Tunnel Lifting | Automatic Pneumatic Lifting |
Waste Heat Recovery | Automatic Waste Heat Recovery (Energy-Saving +-30%) |
PET Tension | Pneumatic Tension |
Casting Substrate | PET Circular Circulation |
Overall Leveling | The Entire Machine Can Be Leveled |
Water Tank Drive | Maintenance-Free Drive Mechanism |
Equipment Material | 304 Stainless Steel For Drying Tunnel Inner Liner And Water Tank |
Equipment Speed | 5-60 Meters/Minute (Variable Frequency Speed Regulation) |
Equipment Power Supply | 380V 50Hz |
Equipment Power | 200KW (Peak Value) |
Q1: Are you a trading company or factory?
A: Factory+trade (integration), more than 20 years focusing on the Lab coating machine field, 5 years exporting experience.
Q2: After an order is placed when to deliver?
A: Generally about 15-25 working days, if there is ready stock for items, we can arrange shipment within 2 working days. Please be aware that our production lead times depend on specific items and item quantities.
Q3: What about the warranty with after-sales services?
A: 12-month warranty. We can help you repair your problem parts for free, after the warranty, our professional after-sale service team will provide perfect technical support and help our customers solve problems we encounter while using our products, and handle customer problems and complaints in a professional and timely.
Q4: What about the product's services and quality?
A: Each piece of equipment must be carried out 100% quality examination and test when shipping and delivering goods. Product use training, each of our products provides video training to show you how to install & operate. We can arrange for an engineer to train the operation of equipment to the customer's company when you need. products are widely recognized and trusted by users.
Q5: Can your products be customized?
A: Yes, our product can be customized according to your parameters.