Customization: | Available |
---|---|
After-sales Service: | Online Video After-Sales |
Warranty: | 1year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Control System
|
Independently developed by GAONENG
|
Coating Width
|
300 mm(Effective)
|
Coating Method
|
Hot Melt Adhesive Doctor Blade
|
Adhesive Supply Method
|
Pneumatic Adhesive Supply
|
Melt Cylinder Capacity
|
1 liter
|
Coating Thickness
|
0.01-1 mm (Accuracy±5 micrometers)
|
Coating Length
|
400 mm
|
Heating Temperature
|
Ambient Temperature -180
|
Bottom Plate Heating
|
Heated Bottom Plate
|
Traction Motor
|
Stepper Motor (With Reducer)
|
Tension Control
|
Single Sheet with Tension Roller
|
Machine Speed
|
0.5-3 meters/minute
|
Power Supply
|
220V
|
Power Consumption
|
6000W
|
1. Are your a trading company or factory?
|
We are the source factory, specializing in the field of coating machines and printing machines.
|
|
2. After an order is placed, when to deliver?
|
We can ship within seven days after receiving the full payment.
|
|
3.What about the warranty with after-sales services?
|
We offer a one-year warranty. If any machine parts are damaged within one year (excluding human factors), we will provide replacement parts free of charge and offer online technical guidance. You only need to cover the shipping costs for the parts.
|
|
4.What about the product's services and quality?
|
Before shipment and delivery, we invite customers to our factory to conduct a 100% quality inspection and testing together with our engineers, as well as provide machine operation training. Each machine will also come with a video tutorial demonstrating how to install and operate it. Our machines have received widespread recognition and trust from our customers.
|
|
5.Can your products be customized?
|
Yes, our product can be customized according to your parameters.
|
|
6.What are your payment terms
|
The customer will pay 50% of the payment to initiate production. After the equipment is completed and passes the customer's inspection at our factory, the customer will pay the remaining 50% of the payment. We will pack and ship the equipment within 7 days after receiving the full payment.
|