Customization: | Available |
---|---|
Certification: | CE, CE |
Coating Application: | Aerospace Industry, Automotive Industry, Construction Industry, Electronics Industry, Food Industry, Medical Industry, Renewable Energy Industry, Textile Industry |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Control System
|
Independently developed by GAONENG
|
Human-Machine Interface
|
10-inch touchscreen
|
Coating Width
|
600mm (effective)
|
Coating Method
|
Double-sided coating (dual roller)
|
Coating Thickness
|
Adjustable on one side
|
Drying Tunnel Length
|
1.2 meters (vertical)
|
Cooling Function
|
Equipped with air blowing outlet (schematic)
|
Cooling Steel Pipe
|
Outlet with 2 cold water rollers (schematic)
|
Cooling Method
|
Compressed cooling machine
|
Drying Tunnel Temperature
|
Ambient temperature to 200 degrees
|
Tension Control
|
Adjustable tension (unwinding mechanism)
|
Rewind/Unwind Diameter
|
Rewind/unwind diameter 500mm
|
Glue Supply Container
|
304 stainless steel
|
Equipment Speed
|
1-5 meters/minute (adjustable based on actual conditions)
|
Coating Method
|
Continuous coating
|
Heating Method
|
Electric heating
|
Drying Tunnel Exhaust
|
Adjustable exhaust
|
Winding Device
|
Winding Device
|
Material Alignment
|
Automatic alignment (ultrasonic sensor)
|
Equipment Power Supply
|
380V 50Hz
|
Equipment Power
|
20KW (maximum peak value)
|
Equipment Power
|
5KW
|
1. Are your a trading company or factory?
|
We are the source factory, specializing in the field of coating machines and printing machines.
|
|
2. After an order is placed, when to deliver?
|
We can ship within seven days after receiving the full payment.
|
|
3.What about the warranty with after-sales services?
|
We offer a one-year warranty. If any machine parts are damaged within one year (excluding human factors), we will provide replacement parts free of charge and offer online technical guidance. You only need to cover the shipping costs for the parts.
|
|
4.What about the product's services and quality?
|
Before shipment and delivery, we invite customers to our factory to conduct a 100% quality inspection and testing together with our engineers, as well as provide machine operation training. Each machine will also come with a video tutorial demonstrating how to install and operate it. Our machines have received widespread recognition and trust from our customers.
|
|
5.Can your products be customized?
|
Yes, our product can be customized according to your parameters.
|
|
6.What are your payment terms
|
The customer will pay 50% of the payment to initiate production. After the equipment is completed and passes the customer's inspection at our factory, the customer will pay the remaining 50% of the payment. We will pack and ship the equipment within 7 days after receiving the full payment.
|