Customization: | Available |
---|---|
After-sales Service: | Online Video After-Sales |
Warranty: | 1year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Control System
|
Independently developed by GAONENG
|
Human-Machine Interface
|
10-inch Touch Screen (Front and Rear Operation Buttons for Start,Stop,and Pause)
|
Coating Width
|
1600 mm
|
Coating Method
|
Comma Doctor Blade+Micro-Concave (Reserved Position for Mesh Roller Coating)
|
Doctor Blade Adjustment
|
Pneumatic Automatic Up/Down
|
Coating Thickness
|
0.01-5 mm (Uniformity±5%)
|
Thickness Adjustment
|
Digital Micrometer (Numerical Control Adjustment)
|
Heating Tunnel
|
24 meters (2 meters per section)
|
Heating Zone
|
Divided into 2-meter Sections with Independent Temperature Control
|
Heating Control
|
Thermocouple Sensors (Touch Screen Temperature Controller)
|
Tension Control
|
Fully Automatic Tension (50~500N)
|
Alignment Device
|
Fully Automatic Rewinding Alignment
|
Tunnel Fan
|
Adjustable Speed
|
Tunnel Insulation
|
Asbestos Insulation Layer
|
Winding Diameter
|
800 mm
|
Lamination Device
|
Front Automatic Film Lamination (Steel Rod +Rubber Roller +Tension Roller) with Micrometer Adjustment
|
Lamination Device
|
Rear Lamination (Steel Rod +Rubber Roller)
|
Motor Power
|
10 kW
|
Clutch
|
Pneumatic Automatic Clutch
|
Machine Frame Material
|
Metal Plated Panels,Aluminum Alloy+Metal Powder Coated Panels,304 Stainless Steel Interior,Metal Powder Coated Outer Panels
|
Airflow Control
|
Airflow Filter at Tunnel Exit (Uniform Airflow)
|
Machine Speed
|
2-20 meters/minute (Variable Speed Based on Adhesive Drying)
|
Roller Material
|
Anodized Aluminum (High-Temperature Bearings)
|
Belt Slot
|
Reserved Belt Slot for Tunnel Rollers
|
Tunnel Roller Drive
|
Active Side Belt Drive (Dense Roller Setup)
|
Tunnel Material
|
304 Stainless Steel
|
Heating Element
|
Stainless Steel Heating Wires
|
Blower Structure
|
Explosion-Proof Blower Nozzle
|
Heating Temperature Range
|
Ambient Temperature-180(Constant Temperature Setting)
|
Tunnel Structure
|
Arc-Shaped Structure
|
Static Treatment
|
Double-Sided Static Electricity Treatment (Before Coating and Rewinding)
|
Adhesive Supply Method
|
Pneumatic Tank (30 liters)
|
Winding/Unwinding Shafts
|
3-inch Pneumatic Expanding Shafts (Wavy Type)
|
Motor Control
|
Variable Frequency Drive (Delta PLC Control)
|
Tunnel Lifting
|
Dual Pneumatic Cylinders with Safety One-Way Valve
|
Exhaust System
|
Centrifugal Fan (External Interface 100 mm)
|
Power Supply
|
380V Power Supply with AC24V Control
|
Power Consumption
|
Estimated 250 kW (Subject to Actual Measurement)
|
Air Source Connection
|
0.55 MPa -0.7 MPa
|
1. Are your a trading company or factory?
|
We are the source factory, specializing in the field of coating machines and printing machines.
|
|
2. After an order is placed, when to deliver?
|
We can ship within seven days after receiving the full payment.
|
|
3.What about the warranty with after-sales services?
|
We offer a one-year warranty. If any machine parts are damaged within one year (excluding human factors), we will provide replacement parts free of charge and offer online technical guidance. You only need to cover the shipping costs for the parts.
|
|
4.What about the product's services and quality?
|
Before shipment and delivery, we invite customers to our factory to conduct a 100% quality inspection and testing together with our engineers, as well as provide machine operation training. Each machine will also come with a video tutorial demonstrating how to install and operate it. Our machines have received widespread recognition and trust from our customers.
|
|
5.Can your products be customized?
|
Yes, our product can be customized according to your parameters.
|
|
6.What are your payment terms
|
The customer will pay 50% of the payment to initiate production. After the equipment is completed and passes the customer's inspection at our factory, the customer will pay the remaining 50% of the payment. We will pack and ship the equipment within 7 days after receiving the full payment.
|